Welcome to Shanghai HanKing Instrument & Equipment Co.,Ltd

CN/EN

All
  • All
  • Product Management
  • News and Information
  • Enterprise Download

26

2024

-

12

Han Yao New E-Series Hand-Tightened High-Pressure Capillary Tube Installation Demonstration


1. Insert the capillary tube into the front hole of the primary connector, ensuring that the tube’s end protrudes from the connector.

2. Align the red and silver-colored openings of the secondary connector, then snap it into the capillary tube.

3. Rotate the silver aperture so that it is misaligned with the red main connector aperture.

4. Gently twist the secondary connector two turns into the primary connector.

Be careful not to tighten the secondary connector too tightly against the primary connector.

5. Hold the first-level connector and screw it clockwise into the connection end.

6. After tightening, continue to tighten the secondary connector onto the primary connector.

7. Installation completed

Keywords: