Welcome to Shanghai HanKing Instrument & Equipment Co.,Ltd

CN/EN

All
  • All
  • Product Management
  • News and Information
  • Enterprise Download

19

2024

-

12

Protective Column Sleeve HK-XPGCH-Q2 Installation Operation Demonstration


I. Installation Preparation

Prepare the chromatographic column and the guard column sleeve.

2. Unscrew the protective column sleeve.

3. Insert the column core into the column sleeve.

4. Tighten the column sleeve using a 1/2-inch wrench and a 1/8-inch wrench.

5. After inserting into the chromatographic column, rotate and tighten it securely.

6. Installation completed

 

Keywords: